15th Avenue N Corridor Study


Project Background Information

Fifteenth Avenue N provides continuous east/west travel across Dilworth and Moorhead,  connecting North Fargo via 12th Avenue N  to MN336 northeast of Dilworth. The corridor has long since been a popular alternate route to TH 10. Fifteenth Avenue is paved from the Red River to County Road 9, at which point it turns to gravel. As a result, gravel portions of the corridor have greatly suffered and seen deteriorating conditions.

Project Objective

The objective of this study is to develop paved roadway alternatives for this section of 15th Avenue N and to consider the proper jurisdictional ownership for the ongoing operation and maintenance of the roadway. The study will also consider right-of-way needs, impacts to adjacent properties, utility infrastructure, future connections into Dilworth, and intersection treatments.

Project Goals 

  1. Identify known roadway and transportation issues and deficiencies within the study area.
  2. Develop future improvement alternatives based on needs of the public and traffic analysis.
  3. Outline future ownership and maintenance responsibilities of the corridor.

 

Learn more on our input site here!